Abstract
The article deals with the question of how institutional continuity is realized. It presents an analysis of the continuation of the institution of pre-consultation in the Dutch construction industry over a period of nine years, after this was declared illegal as a consequence of European Union regulations. The analysis utilizes a structuration-based practice approach to institutionalization. The findings suggest that institutional continuity is a matter of a social mechanism which emerges as a consequence of the particular way in which practices are enacted, and which has the effect of repairing and/or concealing contradiction so that change is not initiated.
Keywords
Get full access to this article
View all access options for this article.
