Abstract
To understand the effects of bidder’s strategies on contractual modifications, this study utilized econometric methods and a database containing 5,434 engineering service contracts from Brazilian federal government. The results demonstrate the effects arising from the trade-off between the low prices presented in the contractor selection phase and the contractual performance measured by contract modifications. Competition among bidders in a reverse auction with multiple rounds of bid submissions can exacerbate this trade-off, potentially incentivizing risk-taking strategies by bidders. Subsequently, this may lead to the need for contract modifications to facilitate the ongoing execution of the contract.
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.
