This paper presents simulation as a useful analytical tool for project network analysis. Simulation is a powerful tool for evaluating many of the decision parameters involved in project management. A computer program, named STARC, is used to illustrate the effectiveness of computer simulation for project planning. STATGRAPHICS software is used to illustrate some of the post-simulation statistical analyses that can be conducted.
Badiru, Adedeji B. and Gary E. Whitehouse , Computer Tools, Models, and Techniques for Project Management, TAB Professional and Reference Books , New York, 1989.
3.
Badiru, Adedeji B., Project Management in Manufacturing and High Technology Operations , John Wiley & Sons, New York , 1988a.
4.
Badiru, Adedeji B., "Towards The Standardization of Performance Measures for Project Scheduling Heuristics," IEEE Transactions on Engineering Management, Vol. 35, No. 2, May 1988b, pp. 82-89.
5.
Badiru, Adedeji B. and Gary E. Whitehouse , "Introduction to STARC —A Project Scheduling Package," in Simulation: Modeling Manufacturing & Service Systems, Industrial Engineering & Management Press , Norcross, Georgia, 1987, pp.117-123.
6.
Carroll, John M., Simulation Using Personal Computers, Prentice-Hall , Englewood Cliffs, NJ,1987.
7.
Farnum, N.R. and L.W. Stanton, "Some Results Concerning the Estimation of Beta Distribution Parameters in PERT," Journal of Operational Research Society, Vol. 38,1987, pp. 287-290.
8.
Gallagher, C., "A Note On PERT Assumptions," Management Science, Vol. 33,1987, p. 1360
9.
Golenko-Ginzburg, D. "On the Distribution of Activity-Time in PERT," Journal of Operational Research Society, Vol. 39, 1988, pp. 767-771.
10.
Littlefield, T.K., Jr. and P.H. Randolph, "Another Note on PERT Times," Management Science, Vol. 33, 1987 , pp.1357-1359.
11.
MacCrimmon, K.R. and C.A. Ryavec, "An Analytical Study of the PERT Assumptions," Operational Research, Vol.12, 1964, pp.16-37.
12.
McBride, William J. and C.W. McClelland , "PERT and the Beta Distribution," IEEE Transactions on Engineering Management, Vol. EM-14,1967, pp.16-37.
13.
Moder, J.J. and E.G. Rodgers, "Judgement Estimates of the Moments of PERT Type Distributions," Management Science, Vol.15, No. 2,1968, pp. B76-B83.
14.
Pritsker, A.Alan B.; C. Elliott Sigal; and R.D. JackHammersfahr, SLAM II Network Models for Decision Support, Prentice-Hall, Englewood Cliffs, NJ, 1989.
15.
Sasieni, M.W., "A Note on PERT Times," Management Science, Vol. 32,1986, pp.1652-1653.
16.
Van Slyke, Richard M., "Monte Carlo Methods and the PERT Problem," Operations Research, Vol. 11, 1963, pp. 839-860.
17.
Welsh, D.J., "Errors Introduced by a PERT Assumption," Operational Research, Vol.13,1965, pp.141-143.