A simulation model of a Just-In-Time (JIT) manufacturing system using a two-card and a one-card Kanban inventory control system has been developed using the SIMAN simulation language on the IBM microcomputer. The manufacturing system consists of an assembly line with two assembly cells, one manufacturing cell, and one incoming receiving cell.
Bell, R. and Bilalis, N. "Loading and control strategies for an FMS for rotational parts." Proceedings, 1st International Conference on FMS. Brighton, United Kingdom (October 1982), 77-87.
Bollinger, J.G.Annals of the CIRP30:2 (1981), 525-530.
4.
Claybourn, B.H. and Hewit, J.R. "Simulation of Activity Cycle for Robot-Served Manufacturing Cells " Proceedings, 1st International Conference on FMS. Brighton, United Kingdom (October 1982), 443-452.
5.
Conway, R.W.Some Tactical Problems in Simulation Method. Memo RM-3244-PR. The Rand Corporation, Santa Monica, Calif. (October 1962).
6.
Conway, R.W. "Some Tactical Problems in Digital Simulation ." Management Science (October 1963), 248-253.
7.
Fishman, G.S. "Digital Computer Simulation: The Allocation of Computer Time in Comparing Simulation Experiments." Operation Research16 (1968), 87-93.
8.
Hall, R.W.Zero Inventories. Dow Jones-Irwin, Homewood, IL (1983).
9.
Monden, Y.Toyota Production System. IIE Press ( 1983).
10.
Nisanci, H.L. and Sury, R.J.International Journal on Production Research18:1 ( 1900), 31-41.
11.
Pegden, C.D.Introduction to SIMAN. Systems Modeling Corp., State College , Pa. (1982).
12.
Schonberger, R.J.Japanese Manufacturing Technique. The Free Press, New York, N.Y (1982 ).
13.
Shingo, S.Study of Toyota Prod. Sys. from I.E. Viewpoint. Japan Management Association (1981).