WingateG.A.S1997. Validating Automated Manufacturing and Laboratory Applications. Interpharm Press, ISBN 1-57491-037-X.
2.
CoadyP.J.De ClaireA.P.1995. ‘Best Practice Engineering for Validation of Process Control Systems’. Pharmaceutical Engineering, 15 (4), 18–30.
3.
U.K. GAMP Forum (1996). Supplier Guide for Validation of Automated Systems in Pharmaceutical Manufacture. Version 2.0.The Hague: ISPE.
4.
ISO 9001 (1994) Quality Systems — Model for Quality Assurance in Design, Development, Production, Installation and Servicing. Geneva: International Organisation for Standardisation.
5.
ISO 9000–3 (1991) Quality Management and Quality Assurance Standards — Part 3: Guidelines for the Application of ISO 9001 to the Development, Supply and Maintenance of Software. Geneva: International Organisation for Standardisation.
6.
The TickIT Guide: A Guide to Software Quality Management System Construction and Certification Using ISO 9001:1994, Issue 3.0 (1995). London: DISC TickIT Office.
7.
RaglandB1997. The Year 2000 Problem Solver: A Five-Step Disaster Prevention Plan. McGraw-Hill, ISBN 0-07-052517-X.