AbstractGet full access to this articleView all access options for this article.Get accessReferences1.UK FORUM (1994, 1995, & 1996), “Supplier Guide for Validation of Automation Systems in Pharmaceutical Manufacture,” First Draft (1994) launched in London. Second Draft (1995) launched in Amsterdam, Version 2.0 (1996) launched in Basle.