WoodwardJ.L.BoysJ.T., 1980, Water Power & Dam Construction, Vol. 32, No 7, p37–39.
2.
WallaceA.R.HendersonD.S.WhittingtonH.W., 1989, “Capital Cost Modelling of Small Scale Hydro Schemes”, Proceedings 24th Universities Power Engineering Conference, Belfast, UK.
3.
WoodwardJ.L., 1986, “Appropriate Speed and Frequency Control of Micro Hydro Plants”, Proceedings of Workshop on Micro Hydro Installations, Papua New Guinea.
4.
BarnesR.1989. IEEPower Engineering Journal, Vol. 3, No 1, 11–15.
5.
HendersonD.S.MacphersonD.E., 1990, “Development of a Three-Phase Electronic Load Governor for Micro Hydro Generation”, Proceedings 25th Universities Power Engineering Conference, Aberdeen, UK.