BennettW. E. (1985) Thermal oxide reprocessing at Sellafield. The Chemical Engineer, June 1985.
2.
EvansS.F.FidgettM.SmithI.J. (1989) The development and benefits of plant simulators for waste and spent fuel management. International Waste Management Conference, ASME, Kyoto, October 1989.
3.
FidgettM.HarrisonD.W.From design tool to plant simulator - an all purpose model, CIPE '89. I Chem E Symposium Series114, Leeds 1989.
4.
EvansS.F.WylieP. (1990) A plant simulator for the THORP nuclear fuel reprocessing plant at Sellafield, Dynamic simulation in the process industries, I Chem E, June 90.
5.
LitherlandM. (1989) THORP control goes distributed. Control and Instrumentation, April 1989.