ThringM WRobots and Telechirs, Ellis Horwood, London, 1983.
2.
RogersM A M‘Requirements to enable robotics technology to contribute to the revitalisation of UK manufacturing industry’ Proceedings 4th British Robot Association Annual Conference, Brighton 1981, pp 243–253.
3.
MiyakeH‘Study for operation safety and automatic control of preventive machine in farming’Robot (Journal of JIRA) No 17, 16–21, Dec. 1977.
4.
OnoK‘Study and formulation of automated painting systems for bridges’Robot (Journal of JIRA) No 20, 15–22, Sept. 1978.
5.
OnoK‘Study for maintenance safety and labour-saving of chemical equipment’Robot (Journal of JIRA) No 16, 14–22, Sept. 1977.
6.
DoughertyJ J‘Transmission line maintenance — a new tool’EPRI Journal46–47, June 1983.
7.
EstabrookN‘Development of deep ocean work system’Mechanism and machine theory12, 569–576, 1977.
8.
CharlesJVertutJ‘Cable controlled deep submergence tele-operator system’Mechanism and machine theory12, 481–492, 1977.
9.
GeorghioriLFordG‘Arab silver from the Red Sea mud’New Scientist 19 Feb. 1981, pp. 470–472.
10.
CurtisC E‘Ocean mining and the Law of the Sea’New Scientist, 19 March 1981, pp. 736–738.
11.
HardingP‘The advance of the automatic mole’New Scientist, 5 March 1981, pp. 594–597.