Abstract

References
1.
ABB Seatec Ltd document no. JB-0001-132: Technology Team 7 Technical Summary Document of Pre-operations Failures in the BP Foinaven Field .
2.
BP report no. IPT-TPP-036, Troika Field development technical position paper: Risk of Control Pod Failure Due to Internal Corrosion .
3.
BP Amoco report no. S-9000-N-U-9234, Doc. ID 5927: Schiehallion Subsea Hydraulic Control Fluid Leakage Investigation — Findings and Recommendations .
