DeleersnyderJ. L.HodgsonT. J.KingR. E.O'GradyP. J., and SavvaA. (1992), “Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model,”IIE Transactions, 24, 3, 43–56.
GoldrattE. M., and CoxJ. (1984), The Goal: A Process of Ongoing Improvement, North River Press, Croton‐on‐the‐Hudson, NY.
4.
GoldrattE. M. and FoxR. E. (1986), The Race, North River Press, Croton‐on‐the‐Hudson, NY.
5.
HoppW. J., and SpearmanM. L. (1996), Factory Physics: Foundations of Manufacturing Management, Richard D. Irwin, Chicago.
6.
JacobsF. R. (1984), “OPT Uncovered: Many Production Planning and Scheduling Concepts Can Be Applied With or Without The Software,”Industrial Engineering, October, 16, 10, 32–41.
7.
KanetJ. J. (1988), “MRP 96: Time to Rethink Manufacturing Logistics,”Production and Inventory Management Journal, 29, 2, 57–61.
8.
LundriganR. (1986), “What's This Thing Called OPT?”Production and Inventory Management Journal, 27, 2, 2–12.
9.
OhnoT. (1988), Toyota Production System: Beyond Large Scale Production, Productivity Press, Cambridge, MA.
10.
SpearmanM. L.WoodruffD. L., and HoppW. J. (1990), “CONWIP: A Pull Alternative to Kanban,”International Journal of Production Research, 28, 5, 879–894.
11.
SpearmanM. L., and ZazanisM. A. (1992), “Push and Pull Production Systems: Issues and Comparisons,”Operations Research, 40, 521–532.
12.
VollmannT. E. (1986), “OPT as an Enhancement to MRP II,”Production and Inventory Management Journal, 27, 2, 38–46.
13.
WoodruffD. L., and SpearmanM. L. (1992), “Sequencing and Batching for Two Classes of Jobs with Deadlines and Set‐up Times,”Production and Operations Management, 1, 1, 87–102.