AbrahamsonJ., (1995), NASA Associate Administrator, Lieutenant General US Air Force, interview with the author, 5 July 1995, Washington DC.
2.
AgnewS., (1972), address by the Vice President of the United States at the Florida Jaycees State Convention, Daytona Beach, Florida, January 29, 1972, Kennedy Space Center Archive, Florida.
3.
AmbroseS., (1981), Rise to Globalism: American Foreign Policy, 1938–1980, Middlesex, England: Penguin Books, second revised edition.
4.
DailyAerospace (1978), ‘GAO Sticks To Its Guns On Shuttle Fleet Sites,’Aerospace Daily, 8 August 1978: 161–162.
5.
DailyAerospace (1979), ‘Administration Vetoed NASA Plan to Slip Shuttle Further,’Aerospace Daily, 20 September 1979: 36.
6.
WeekAviation (1976a), ‘Shuttle Orbiter Named,’Aviation Week and Space Technology, 13 September 1976: 26.
7.
WeekAviation (1976b), ‘Space Agency Readies Carter's Briefing,’Aviation Week and Space Technology, 15 November 1976: 22.
8.
Aviation Week (1978a), ‘Fifth Orbiter, Stereostat Voted Funding by House Committee’, Aviation Week and Space Technology, 6 March 1978: 13–14.
9.
Aviation Week (1978b), ‘Senate Unit, House Vote Fifth Orbiter,’Aviation Week and Space Technology, 1 May 1978: 22–23.
10.
Aviation Week (1978c), ‘Senate Unit to Consider Funds for Fifth Orbiter,’Aviation Week and Space Technology, 31 July 1978: 21.
11.
Aviation Week (1979a), ‘NASA Budget Provides No Real Growth,’Aviation Week and Space Technology, 22 January 1979: 16.
12.
BarnesB., (1977), Interests and the Growth of Knowledge, London: Routledge & Kegan Paul.
13.
BeggsJ., (1995), NASA Administrator, interview with the author, 6 June 1995, Washington DC.
14.
BlauP., (1963), The Dynamics of Bureaucracy: A Study of Interpersonal Relations in Two Government Agencies, Chicago: University of Chicago Press, revised edition.
15.
BrodyD., (1980), Workers in Industrial America: Essays on the Twentieth Century Struggle, New York, Oxford: Oxford University Press.
16.
CarterD., (1988), The Final Frontier: The Rise and Fall of the American Rocket State, New York: Verso.
17.
CarterPresident J., (1979), letter to Robert Frosch, 26 November 1979, NASA Washington DC: History Office Archive.
18.
CarterPresident J., (1982), ‘Crisis of Confidence Address, July 15, 1979,’ In HofstadterR.HofstadterB. (eds), Great Issues in American History: From Reconstruction to the Present Day, 1864–1981. New York: Vintage Books, 522–524.
19.
ChaffeeN., (1995), Johnson Space Center, Chemical Engineer, interview with the author, 6 September 1995, Houston, Texas.
20.
Congressional Record (1973), ‘The National Space Programme’, cutting from the Congressional Record, the Senate, 30 May 1973, Washington DC: NASA History Office Archive.
21.
Congressional Record (1984), ‘Space Shuttle Requirements, Operations, and Future Plans,’Hearings before the Subcommittee on Space Science and Applications, US House of Representative, Washington DC: US Government Printing Office.
22.
CovaultC., (1974), ‘Inflation Forcing Shuttle Changes,’Aviation Week and Space Technology, 23 September 1974: 20–22.
23.
CovaultC., (1978a), ‘Fifth Orbiter Support Rises in Congress,’Aviation Week and Space Technology, 27 February 1978: 20–21.
24.
CovaultC., (1978b), ‘Space Policy Mandates US Leadership,’Aviation Week and Space Technology, 16 October 1978: 24–26.
25.
CovaultC., (1979a), ‘Debate on Space Policy Heats’, Aviation Week and Space Technology (5 February 1979): 12–13.
26.
CovaultC., (1979b), ‘Space Policy Discussion Stresses Solid Goal Need,’Aviation Week and Space Technology (19 February 1979): 52–54.
27.
CovaultC., (1979c), ‘Administration Backs Shuttle Fund Rise,’Aviation Week and Space Technology (17 September 1979): 22–23.
28.
CovaultC., (1979d), ‘Carter Backs Shuttle Fund Rise’, Aviation Week and Space Technology (19 November 1979): 16–18.
29.
CranstonA., (1973), Press release from the Office of US Senator Alan Cranston, 10 April 1973, Washington DC: Smithsonian Air and Space Museum.
30.
DerbyshireI., (1988), Politics in the United States: From Carter to Bush, Edinburgh: W & R Chambers Ltd.
31.
DailyDefense (1979), ‘House Unit Okays $185 million FY ‘79 Supplement For Shuttle’, Defense/Space Daily (7 March 1979): 34.
32.
DonlanC., (1995), NASA Deputy Associate Administrator for Manned Space Flight, interview with the author, 7 June 1995, Washington DC.
33.
DosiG., (1982), ‘Technological paradigms and technological trajectories: A suggested interpretation of the determinants and directions of technical change,’Research Policy11: 147–162.
34.
EnglishG., (1995), NASA bureaucrat at Kennedy, interview with the author, 26 July 1995, Kennedy, Florida.
35.
FinkD., (1983), Chairman NASA Advisory Council, letter to James Beggs, 17 November 1983, Washington DC: NASA History Office Archive.
36.
FletcherJ., (1973a), letter to Richard Nixon, 13 July 1973, Washington DC: NASA History Office Archive.
37.
FletcherJ., (1973b), letter to Roy Ash, Director of OMB, 13 July 1973, Washington DC: NASA History Office Archive.
38.
FletcherJ., (1976a), letter to President Ford, 4 June 1976, Washington DC: NASA History Office Archive,
39.
FletcherJ., (1976b), Letter to James Lynn, Director Office of Management and Budget, 22 October 1976, Washington DC: NASA History Office Archive.
40.
FletcherJ., (1977), Memorandum to John Yardley, 28 March 1977, Washington DC: NASA History Office Archive.
41.
FroschR., (1977a), Letter to Representative Edward Boland, Democrat, Massachusetts, 9 November 1977, Washington DC: NASA History Office Archives.
42.
FroschR., (1977b), statement before the Senate Appropriations Committee, HUD – Independent Agencies Committee, draft version, 29 November 1977, Washington DC: NASA History Office Archives.
43.
FroschR., (1979a), letter to Senator Howard Cannon, reprinted in Aerospace Daily, 14 May 1979: 68.
44.
FroschR., (1979b), Memorandum to President Carter, 11 September 1979, Washington DC: NASA History Office Archive.
45.
FroschR., (1979c), press briefing on Robert Frosch's conversation with President Carter regarding the space Shuttle, 14 November 1979, Washington DC: NASA History Office Archive.
46.
GAO, (1973), Analysis of Cost Estimates for the Space Shuttle and Two Alternate Programs, report to the Congress, 1 June 1973, Washington DC: General Accounting Office Distribution Center.
47.
GAO, (1982), NASA Must Reconsider Operations Pricing Policy to Compensate for Cost Growth on the Space Transportation System, report to the Congress, 23 February 1982, Washington DC: General Accounting Office Distribution Center.
48.
GregoryW., (1976), ‘Shuttle Opens Door to New Space Era,’Aviation Week and Space Technology, 8 November 1976: 39–43.
49.
HechlerK., (1980), Towards the Endless Frontier: History of the Committee on Science and Technology, 1959–79, Washington DC: US Government Printing Office.
50.
HeppenheimerT. A., (1999), The Space Shuttle Decision: NASA's Search for a Reusable Space Vehicle, Washington DC: NASA History Series.
51.
HobanF., (1995), Executive Assistant to the NASA Deputy Administrator, interview with the author, 15 May 1995, Virginia: Fairfax.
52.
HobsbawmE., (1994), The Age of Extremes: The Short Twentieth Century 1914–91, London: Michael Joseph Ltd.
53.
HotzR., (1972), ‘Editorial,’Aviation Week and Space Technology, July 31, 1972: 7.
54.
JeffreySmith R., (1979), ‘Shuttle Problems Compromise Space Program,’Science206, 23 November 1979: 910–914
55.
JohnsenK., (1974), ‘Inflation Boosts Labor Demands’, Aviation Week and Space Technology, 23 July 1974: 12–13.
56.
KillianJ. R., (1982), Sputnik, Scientists, and Eisenhower, Cambridge Mass: MIT Press.
57.
KozicharowE., (1976), ‘Shuttle Support Seems Assured,’Aviation Week and Space Technology, 8 November 1976: 14–15.
58.
KraftC., (1995), Director of Johnson Space Center, interview with the author, 1 September 1995, Houston, Texas.
59.
LappR., (1972), ‘Testimony to the Committee on Aeronautical and Space Science,’ in NASA Authorization for Fiscal Year 1973, Washington DC: US Government Printing Office.
60.
LatourB., (2005), Reassembling the Social: An Introduction to Actor-Network-Theory, Oxford: Oxford University Press.
61.
LawJ.MolA., (2002), Complexities: Social Studies of Knowledge Practice, Durham NC: Duke University Press.
62.
LeeC., (1979), letter to John Yardley, 30 March 1979, Washington DC: NASA History Office Archive.
63.
LeeC., (1995), Director of STS Operations, interview with the author 2 May 1995, Arlington, Virginia.
64.
LogsdonJ. M., (1986), ‘The Space Shuttle Program: A Policy Failure?’Science232, 30 May 1986.
65.
LovelaceA., (n.d.), Memorandum to Curt Hessler, Associate Director OMB, no date, Washington DC: NASA History Office Archives.
66.
LovelaceA., (1979), Memorandum to Robert Frosch, reprinted in Aerospace Daily, 14 May 1979: 69.
67.
LovelaceA., (1981) quoted in, ‘Lovelace sees Fewer Flights, Increased Costs Likely For Shuttle,’Aerospace Daily, May 6, 1981: 25–26.
68.
LowG., (1976a), Memorandum for the record, meeting with Malcolm Currie on orbiter procurement and reimbursement policy, 19 May 1976, Washington DC: NASA History Office Archive.
69.
LowG., (1976b), Memorandum to Associate Administrator for Space Flight, 19 April 1976, Washington DC: NASA History Office Archive.
70.
LowG., (1976c), Memorandum to James Fletcher, 28 May 1976, Washington DC: NASA History Office Archive.
71.
LowG.CurrieM., (1976a), Memorandum to the Secretary of Defense and the NASA Administrator, 8 May 1976, Washington DC: NASA History Office Archive.
72.
LowG.CurrieM., (1976b), proposed memorandum to be signed by NASA Administrator, James Fletcher and Secretary of Defense, Donald Rumsford, and sent to the President or the director of the OMB, 8 May 1976, Washington DC: NASA History Office Archive.
73.
Machinist (1972), ‘Convention Backs McGovern, No Support at all for Nixon’The Machinist, 14 September 1972: 1: 7.
74.
Machinist (1973), ‘UAW + IAM = Shuttle’, The Machinist, 12 April 1973: 1.
75.
MacKenzieD., (1993), Inventing Accuracy: A Historical Sociology of Nuclear Missile Guidance, Cambridge, Mass: MIT Press.
76.
MakotoI., (1990), The World Crisis and Japanese Capitalism, London, MacMillan Press.
77.
MalkinM., (1973), Memorandum to Associate Administrator for Manned Space Flight, 30 May 1973, Washington DC: NASA History Office Archive.
78.
MarkH., (1995), Director NASA Ames Center and Secretary of the US Air Force, interview with the author, 8 September 1995, Austin, Texas.
79.
MarshA., (1979), ‘SALT Support Tied to Defense Gains,’Aviation Week and Space Technology, 6 August 1979: 20.
80.
McCartneyF., (1995) NASA Kennedy Space Center Director, Lieutenant General US Air Force, interview with the author, 28 July 1995, Kennedy, Florida.
81.
McCurdyH., (1993), Inside NASA: High Technology and Organizational Change in the US Space Program, Baltimore: Johns Hopkins University Press.
82.
McDougallW. A., (1985), The Heavens and the Earth: A Political History of the Space Age, New York: Basic Books.
83.
McElhenyV., (1976), ‘Aerospace Contracts, Put at $1 Billion, Hinge on Debate Over Space Shuttles’, The New York Times, 24 August 1976: 37.
84.
McGovernG., (1974), An American Journey: The Presidential Campaign Speeches of George McGovern, New York: Random House.
85.
MyersD., (1971a), Memorandum to Deputy Associate Administrator, Planning, 17 June 1971, Washington DC: NASA History Office Archives.
86.
MyersD., (1971b), ‘Statement at the hearings before The Committee on Science and Astronautics,’ in 1972 NASA Authorization, Washington DC: US Government Printing Office.
87.
NAC (1983), NASA Advisory Council study of effective shuttle utilization, conducted by a NAC Task Force, 1983, Washington DC: NASA History Office Archive.
88.
NASA (1972), ‘Comments on the Statement of Dr Ralph Lapp on the Space Shuttle’, in NASA Authorization for Fiscal Year 1973, Washington DC: US Government Printing Office.
89.
NASA (1976), draft issue paper on orbiter procurement, 8 May 1976, Washington DC: NASA History Office Archive.
90.
NASA (1979), NASA Activities, May 1979, Washington DC: NASA History Office Archive.
91.
NASA (1995), Pocket Statistics, Washington DC: NASA History Office.
92.
NASA/DOD (1973), Space Shuttle Orbiter Fleet Size Analysis, prepared by the Office of Manned Space Flight and US Air Force Systems Command, 15 May 1973, Washington DC: NASA History Office Archive.
93.
NixonR., (1972), Press Release from the Office of the White House Press Secretary, 5 January 1972, Washington DC: National Air and Space Museum.
94.
NixonR., (1978), The Memoirs of Richard Nixon, London: Sidgwick & Jackson Ltd.
95.
NobleD., (1984), Forces of Production: A Social History of Industrial Automation, New York: Alfred Knopf.
96.
NobleWilford J., (1979), ‘Delay in Space Shuttle Facing Carter Review; Funds May be Raised,’New York Times, 11 May 1979.
97.
OMB (1977), Space Shuttle: Office of Management and Budget Production Options February 2, 1977, Washington DC: NASA History Office Archives.
98.
OMSF (1970), Office of Manned Space Flight, Space Shuttle Program Requirements Document Level 1, 1 July 1970, Washington DC: NASA History Office Archive.
99.
OMSF (1974), Office of Manned Space Flight, Space Shuttle Program Requirements Document Level 1, Revision No. 4, 12 March 1970, Washington DC: NASA History Office Archive.
100.
O'TooleT., (1976), ‘Space Shuttle Orbiter Shown for First Time in California’, Washington Post, 18 September 1976.
101.
O'TooleT., (1979), ‘Space Shuttle Money Pinch May Force Science to Back Seat,’The Washington Post, 6 May 1979.
102.
PrestonM., (1971), Memorandum, 4 June 1971, Florida: Kennedy Space Center Archive.
103.
ReichleyJ., (1981), Conservatives in an Age of Change: The Nixon and Ford Administrations, Washington DC: The Brookings Institute.
104.
RolandA., (1985), ‘The Shuttle: Triumph or Turkey’, Discover, November 1985.
105.
RolandA., (1989), ‘Barnstorming in Space: The Rise and Fall of the Romantic Era of Spaceflight, 1957–1986,’ in ByerlyRadford (ed.) Space Policy Reconsidered, San Francisco: Westview Press.
106.
SchellJ., (1975), The Time of Illusions, New York: Vantage.
107.
ShapelyW., (1972), memorandum to George Low, 26 July 1972, Washington DC: NASA History Office Archive.
108.
Space Business Daily (1973a), ‘Mondale Hoping New GAO Report will Help Kill Shuttle’, Space Business Daily, 11 April 1973: 230.
109.
Space Business Daily (1973b), ‘Proxmire “Frustrated” by Capable Defense of Shuttle’Space Business Daily, 12 April 1973: 236–238.
110.
Space Business Daily (1973c), ‘Ranking GOP Committee Member Opposes Proxmire on Shuttle’, Space Business Daily, 4 June 1973: 188.
111.
ThompsonR., (1995), Space Shuttle Manager, interview with the author, 9 September 1995, Houston, Texas.
112.
TischlerA., (1995), NASA Director of Chemical Propulsion within the Office of Advanced Research and Technology, interview with the author, 3 May 1995, Washington DC.
113.
TribeJ., (1995), Rockwell Chief Engineer at Kennedy Space Center, interview with the author, 28 July 1995, l.
114.
TufteE., (1978), Political Control of the Economy, New Jersey: Princeton University Press
115.
VaughnD., (1996), Challenger Launch Decision: Risky Technology, Culture, and Deviance at NASA, University of Chicago Press.
116.
White House Press Office (1978), press release from the Office of the White House Press Secretary on the Presidents Space Policy, 18 October 1978, Marshall Space Flight Center Archive, Huntsville, Alabama.
117.
WinnerL., (1978), Autonomous Technology: Technics-out-of-Control as a Theme in Political Thought, Cambridge: Massachusetts, MIT Press.
118.
WoodsB., (2003), ‘Heated Debates: A History of the Space Shuttle's Thermal Protection System 1970–1981,’Quest: The History of Spaceflight Quarterly, 10, 3: 39–55.
119.
YarbroughH., (1995), NASA, Johnson Space Centre, Interview with the author, 5 September 1995, Huston, Texas.
120.
YardleyJ., (1979), ‘To the First Launch,’Aeronautics & Astronautics, February, 1979: 28–34.
121.
YardleyJ., (1995), NASA Associate Administrator for Space Transportation System, President of McDonnell Douglas Aeronautics, interview with the author, 9 August 1995, St Louis, Missouri.