This paper introduces the reorganized China Baowu Iron and Steel Group. The ironmaking facilities at several plants within the Baosteel Group are described together with technical indexes related to high efficiency, low carbon production operations. A description is also presented of the world's first large blast furnace intelligence control centre aimed at monitoring and managing operations at blast furnaces located within different Baosteel facilities.
Get full access to this article
View all access options for this article.
References
1.
National Bureau of Statistics of the People’s Republic of China. The national data of iron, steel and steel products output. Available from: http://data.stats.gov.cn/
2.
LiuZJ.Increasing benefits by means of multiple measures—speech at the symposium on financial work in iron and steel industry and the meeting of the committee on finance and price. China Steel. 2016;4:5–9.
ZhuRLet al.Operation and management of large blast furnace in Baosteel. Chinese: Metallurgical Industry Press.
6.
ZhangSRYuZJet al.Long campaign technology of blast furnace in WISCO. Chinese: Metallurgical Industry Press.
7.
XiangZYWangL.Intensified smelting of blast furnace at low fuel rate. Ironmaking. 2011;30(2):22–25. Chinese.
8.
XiangZYWangXLLiuYCet al.Policy implementation of low-carbon ironmaking using a new evaluation method of blast furnace production efficiency. China Metall. 2016;26(7):1–6.
9.
ZhuRL.Stable production practice in Baosteel’s BF under scientific management. Ironmaking. 2016;35(4):1–7. Chinese.
10.
WangXL.Ironmaking metallurgy. 2013. 282–283. Metallurgical Industry Press. Chinese.
11.
QianSCZhangFMLiXet al.Technical analysis on hot blast Stove of large capacity blast furnace. Iron Steel. 2011;46(10):1–10.
12.
ZhuJM.The practice on Baosteel blast furnace over 200 kg/t pulverized coal rate. Ironmaking. 2005;24(Suppl):36–40. Chinese.
13.
XuWRLiZYGuoYL.Production practice of economical coal injection rate in No. 1 blast furnace of Baosteel. Ironmaking. 2010;29(1):29–31. Chinese.
14.
LiWG.Operation and management outline of large Sized blast furnace. Ironmaking. 2011;30(3):1–7. Chinese.
15.
ChenLKLiXWLuLWet al.Practice of high efficient smelting in WISCO’s No. 8 blast furnace. Ironmaking. 2016;35(5):1–7. Chinese.
16.
LiWG.Thoughts on improvement of super large BF operation and management in China. Ironmaking. 2017;36(5):1–7. Chinese.
17.
WangCSongWHXuF.Practice to control the blast kinetic energy of no. 2 BF at Baosteel. Shanghai Metals. 2013;35(1):35–39.
ChenXZDingAHWuY.Design and implementation of radar burden imaging system in blast furnace. Metall Ind Autom. 2009;33(2):52–56. Chinese.
20.
ChenXZYinYXHouQWet al.Improvement of a radar signal processing system for burden surface measurement in a blast furnace. J Univ Sci Technol Beijing. 2011;33(2):215–220. Chinese.