Hill, Morris (1968) A Goals-Achievement Matrix for Evaluating Alternative Plans. Journal of the American Institute of Planners, Vol. XXXIV, No. 1.
2.
Holmes, J.C. (1972) An Ordinal Method of Evaluation. UrbanStudies, Vol. 9, No. 1.
3.
Holmes, J.C. (1973) An Ordinal Method of Evaluation: A Rejoinder. UrbanStudies, Vol. 10, No. 1.
4.
Kettle, Peter and Whitbread, Michael (1973) An Ordinal Method of Evaluation: A Comment. Urban Studies, Vol. 10, No. 1.
5.
Lichfield, Nathaniel (1966) Cost Benefit Analysis in Town Planning. UrbanStudies, Vol. 3, No. 3.
6.
McLoughlin, J. Brian (1969) Urban and Regional Planning: A Systems Approach . London: Faber and Faber.
7.
Metropolitan Toronto (1971) Joint Technical Transportation Planning Committee. Spadina Rapid Transit Alignment Study: Evaluation of The Relative Performance of Five Selected Alignments . (With Addendum No. 1, January 1972 and Addendum No. 2, February 1972.)
8.
Metropolitan Toronto Planning Board (1973) Preliminary Evaluation Cycle, Part II: Study Design. North-East Corridor Go-Urban Study. Consultants: De Leuw-Dillon .
9.
Schimpeler, Charles C. and Grecco, William L. (1968) Systems Evaluation: An Approach Based on Community Structure and Values. Highway Research Record, No. 238.
10.
Schlager, Kenneth (1968) The Rank-Based Expected Value Method of Plan Evaluation . Highway Research Record, No. 238.
11.
Stevens, S.S. (1946) On the Theory of Scales and Measurement. Science, Vol. 103, No. 2684. Re-printed in A. Danto and S. Morgenbesser (eds.), Philosophy of Science. New York: World Publishing , 1960.
12.
WilliamsAlan, (1972) Cost Benefit Analysis: Bastard Science? And/Or Insidious Poison in the Body Politick?Journal of Public Economics , Vol. 1, No. 2. Re-printed W. A. Niskanen et al. (eds.). Benefit-Cost and Policy Analysis, 1972. Chicago : Aldine Publishing Co., 1973.